285 Old Black Rock Turnpike, Fairfield — property record card
SFR Water built in 1949, 3 bed, 3 bath, 2,188 ft² in Fairfield, appraised at $1,172,019 (assessed $820,413); last sold for $1,299,000 on October 14, 2025.
Rebuilt from the public Connecticut CAMA and Parcel Layer — not the official card. For the official card, with owner, photo and sketch, ask the Fairfield assessor’s office.
Parcel
| Location | 285 Old Black Rock Turnpike, Fairfield CT 06824 |
|---|
| Parcel ID | 0732380000 |
|---|
| CAMA account | 26620-5820 |
|---|
| Use | SFR Water (state use code 1013) |
|---|
| Zone | A |
|---|
| Planning region | Greater Bridgeport |
|---|
Valuation — revaluation 2025
| Appraised (market value) | $1,172,019 land $977,619 · building $168,500 · outbuildings $25,900 |
|---|
| Assessed (70%) | $820,413 land $684,333 |
|---|
Land
| Lot size | 1.00 acres (43,560 ft²) |
|---|
Building
| Year built | 1949 (effective 1980) |
|---|
| Living area | 2,188 ft² |
|---|
| Rooms | 7 |
|---|
| Bedrooms | 3 |
|---|
| Bathrooms | 3 full |
|---|
| Condition | 5.0 |
|---|
Sales
| Last sale | $1,299,000 — October 14, 2025 |
|---|
What this means
- Connecticut taxes property at 70% of its appraised market value: the assessment $820,413 times the town mill rate gives the yearly tax.
- Fairfield last revalued in 2025. Towns revalue every five years; between two revaluations the appraisal stays the same even if the market moves.
- Assessed close to the median for this use in Fairfield ($781,862, 82 parcels).
- The last sale price is 11% above the appraisal.
Point at the centre of the parcel — not a survey.
Data: Connecticut CAMA and Parcel Layer (2026 collection, CC0), retrieved October 31, 2026. Sources and freshness. No owner names are published.

The report for 285 Old Black Rock Turnpike
This card shows what the assessor records. The report adds what lies around the parcel: FEMA flood zone, wetlands and watercourses, aquifer protection area, Natural Diversity Database areas, brownfields nearby and sewer service.
$19card · PDF within 24 h · you pay after receiving itSee the sample (PDF)
Order the report